[ET Trac] [Einstein Toolkit] #1171: WeylScal4 schedule order is incorrect

Einstein Toolkit trac-noreply at einsteintoolkit.org
Wed Nov 7 10:12:28 CST 2012


#1171: WeylScal4 schedule order is incorrect
-----------------------------------+----------------------------------------
 Reporter:  hinder                 |       Owner:     
     Type:  defect                 |      Status:  new
 Priority:  major                  |   Milestone:     
Component:  EinsteinToolkit thorn  |     Version:     
 Keywords:  WeylScal4 testsuite    |  
-----------------------------------+----------------------------------------
 WeylScal4 contains a calculation for computing the I and J invariants from
 the Psis.  This calculation is not scheduled explicitly after the Psis.
 Therefore, Cactus will probably schedule the routines alphabetically,
 which should be wrong.  This should be corrected either with an After or
 Schedule element in the calculation.

-- 
Ticket URL: <https://trac.einsteintoolkit.org/ticket/1171>
Einstein Toolkit <http://einsteintoolkit.org>
The Einstein Toolkit


More information about the Trac mailing list