[ET Trac] [Einstein Toolkit] #2182: NewRad's extrapolation methods for Gammas expect ghost zones to be valid
Einstein Toolkit
trac-noreply at einsteintoolkit.org
Tue Aug 21 10:47:16 CDT 2018
#2182: NewRad's extrapolation methods for Gammas expect ghost zones to be valid
------------------------------------+---------------------------------
Reporter: Roland Haas | Owner: (none)
Type: defect | Status: new
Priority: major | Milestone: ET_2018_08
Component: EinsteinToolkit thorn | Version: development version
Resolution: | Keywords: ML_BSSN NewRad
------------------------------------+---------------------------------
Comment (by Roland Haas):
I have to see how to actually make this change in the Kranc source. What
one needs is a {{{SYNC: ML_Gamma}}} to ML_BSSN's schedule block for
{{{ML_BSSN_InitialADMBase2Interior}}}. Suggestions on how to achieve this
best would be very welcome.
In theory as {{{SYNC}}} should always be harmless. I will run the BBH
gallery example for a bit to make sure though. I have checked (before even
creating the ticket) that adding the SYNC lets me run the previously
failing parfile (which has no multipatch and no mesh refinement so is far
from a production) without failures.
--
Ticket URL: <https://trac.einsteintoolkit.org/ticket/2182#comment:3>
Einstein Toolkit <http://einsteintoolkit.org>
The Einstein Toolkit
More information about the Trac
mailing list