<div class="gmail_quote">On Tue, Jul 6, 2010 at 3:29 AM, David Radice <span dir="ltr">&lt;<a href="mailto:david.radice@aei.mpg.de">david.radice@aei.mpg.de</a>&gt;</span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex;">
Dear all,<br>
<br>
in order to use the CactusNumerical/Noise thorn to perform a stress test<br>
on the hydro equations &quot;id_noise&quot; has to be properly scheduled with<br>
respect to HydroBase_Initial and HydroBase_Prim2ConInitial. As it is now<br>
numerical perturbation on the hydro variables could be discarded /<br>
overwritten.<br>
<br>
The attached (trivial) patch fixes the above mentioned issue and<br>
includes some small aesthetic fixes. Could you please consider applying<br>
it to the development branch of the Einstein Toolkit?<br></blockquote><div><br></div><div>David</div><div><br></div><div>Thanks for your patch; I have applied it.</div><div><br></div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex;">
PS: note that the hydro thorn has to schedule Prim2Con in<br>
HydroBase_Prim2ConInitial otherwise the perturbation are simply<br>
ignored/overwritten.<br></blockquote><div><br></div><div>I don&#39;t know about this.  Frank, can you confirm this?  Is there a problem in GRHydro?</div><div><br></div><div>-erik</div></div><br>-- <br>Erik Schnetter &lt;<a href="mailto:schnetter@gmail.com">schnetter@gmail.com</a>&gt;   <a href="http://www.cct.lsu.edu/~eschnett/">http://www.cct.lsu.edu/~eschnett/</a><br>