[ET Trac] [Einstein Toolkit] #1499: Error in synchronisation after restriction

Einstein Toolkit trac-noreply at einsteintoolkit.org
Wed Dec 18 00:12:56 CST 2013


#1499: Error in synchronisation after restriction
---------------------+------------------------------------------------------
  Reporter:  hinder  |       Owner:  eschnett           
      Type:  defect  |      Status:  reopened           
  Priority:  major   |   Milestone:  ET_2014_05         
 Component:  Carpet  |     Version:  development version
Resolution:          |    Keywords:                     
---------------------+------------------------------------------------------
Changes (by rhaas):

  * status:  reviewed_ok => reopened


Comment:

 The release test was violating the CFL condition and blowing up. Results
 were thus highly compiler dependent and failed on the (gcc based) test
 system. I attach a patch that change the timestep and passes on both 1 and
 2 processes using gcc and intel and on intel and AMD machines. Undoing the
 sync fix makes the test fail on 2 processes.

-- 
Ticket URL: <https://trac.einsteintoolkit.org/ticket/1499#comment:17>
Einstein Toolkit <http://einsteintoolkit.org>
The Einstein Toolkit


More information about the Trac mailing list