Present: Roland, Zach, Peter, Ian, Frank, Steve, Matt
upcoming release: * timetable on wiki https://docs.einsteintoolkit.org/et-docs/Release_Details * no new thorns/major changes after 2014-04-21 * release data 2014-05-19 * large chunk of GRHydro updates at https://trac.einsteintoolkit.org/ticket/1531 will be included ** keep F90 code as default ** switch test data for constrained transport ** plan for future releases: phase out F90 code, phase out divergence cleaning code
Failing tests: * currently 2 tests in wavetoy fail * they involve initializing 3 timelevels * Peter to investigate if only grid arrays as involved (then we just document this) or grid functions as well (then we have to fix it)
Test suites: * ask Erik and Ian if willing to run using their automated framework on the HPC machines. Individual users to run on "private" machines. * table at https://docs.einsteintoolkit.org/et-docs/Release_Details to assign machines to people
New code: * test IllinoisGRMHD on all machines to check that it compiles and passes tests * include in ET thornlist but leave commented out and add comment that this is experimental
Gallery: * small examples of non-trivial code * BBH (qc0): Ian * BH: Peter * NSNS to HMNS: Roland * NSNS to BH: currently fails * TOV collapse: Roland was volunteered, but suspects this will fail
Yours, Roland